Corporate Headquarters

4711 Viewridge Avenue, Suite 210

San Diego, CA 92123-1654

p: 858.541.0788

f: 858.541.0787

ARRIVE HOTEL

Palm Springs, California

Project Summary

Walsh Engineers re-designed, from a semi-modular building hotel complex, to a slab on grade framed construction-type. The project consists of two 2-story buildings (Living units), two 1-story buildings (Living Units), two Retail Shops (shell only), one Restroom Facility Building, one Restaurant/Kitchen Building, and one Housekeeping Building. Included were domestic vent and waste piping design, potable hot and cold water piping design, site plumbing design outside 5-feet building line, AC coil condensate drainage design, final plumbing fixture specification and coordination for Buildings 1 thru 4 only, outline gas service needs for Buildings 1 thru 4 only, outline plumbing riser and design scheme, review of plumbing points of connection with civil engineer, and water and sewer utilities coordination with civil engineer.

Comments

© 2019 Walsh Engineers

All rights reserved.

Designed by

Contact

Admin@WalshEngineers.com

Webmaster

connect with us

top