Corporate Headquarters

4711 Viewridge Avenue, Suite 210

San Diego, CA 92123-1654

p: 858.541.0788

f: 858.541.0787

ARMY NAVY ACADEMY ATHLETIC FACILITY

Carlsbad, California

Project Summary

This project consisted of the mechanical and plumbing engineering and design of two buildings:

  • The Athletic Center, totaling approximately 27,400 square feet, is a 2-story structure with a gymnasium/multi-purpose room, wrestling/training room, home and visitor locker rooms with showers, weight room, male and female restrooms, equipment storage room, meeting room, coaches offices and locker room, administrative offices, conference room, private offices, and general support/common areas.
  • Press Box Building, totaling approximately 1,935 square feet, is a 2-story structure with male and female restrooms, concession stand with storage, and five private suites.

Comments

© 2019 Walsh Engineers

All rights reserved.

Designed by

Contact

Admin@WalshEngineers.com

Webmaster

connect with us

top