Corporate Headquarters

4711 Viewridge Avenue, Suite 210

San Diego, CA 92123-1654

p: 858.541.0788

f: 858.541.0787

EXECUTIVE SQUARE

La Jolla, California

Project Summary

Design and construction of a replacement of the Air Handling Unit on the 16th, 15th, and 14th floors with energy laboratory air handling unit. Reflect air handler cooling and air flow requirements needed, air handler selections, coordination with electrical and structural engineers, roof layout for air handler placement, new ductwork layout, and new chilled water piping layout. Provide piping diagrams, air handler piping and accessory details, mounting details for air handlers, ductwork, and piping. Control systems design coordination with control vendor selected by client.

Comments

© 2019 Walsh Engineers

All rights reserved.

Designed by

Contact

Admin@WalshEngineers.com

Webmaster

connect with us

top