Corporate Headquarters
4711 Viewridge Avenue, Suite 210
San Diego, CA 92123-1654
p: 858.541.0788
f: 858.541.0787
EXECUTIVE SQUARE
La Jolla, California
Project Summary
Design and construction of a replacement of the Air Handling Unit on the 16th, 15th, and 14th floors with energy laboratory air handling unit. Reflect air handler cooling and air flow requirements needed, air handler selections, coordination with electrical and structural engineers, roof layout for air handler placement, new ductwork layout, and new chilled water piping layout. Provide piping diagrams, air handler piping and accessory details, mounting details for air handlers, ductwork, and piping. Control systems design coordination with control vendor selected by client.
Comments
Contact