Corporate Headquarters

4711 Viewridge Avenue, Suite 210

San Diego, CA 92123-1654

p: 858.541.0788

f: 858.541.0787

IVY HIGH SCHOOL

Fallbrook, California

Project Summary

Coordinate and provide plumbing hook-ups for (1) new library, (1) new administrative, (3) new computer labs, (1) P.E., (4) classroom, and (1) restroom buildings with the assistance of a civil engineer for site utilities. All building units will come pre-engineered with heating, cooling, and ventilation thus no HVAC engineering and design was required. The project was submitted and approved through the Division of the State Architect (DSA 04-113383).

Comments

© 2019 Walsh Engineers

All rights reserved.

Designed by

Contact

Admin@WalshEngineers.com

Webmaster

connect with us

top